Previous Topic

Next Topic

Book Contents

Book Index

Multiple Copies of a Task

Although the scheduler will not run a task if a copy of the task is already running, it is possible to run multiple simultaneous copies of a task outside the scheduler. A second or subsequent instance of a task can be run in these cases:

This capability was introduced in MOVEit Central 5.5.