This procedure describes how to resync the slave database node to the master database node. This procedure is typically performed during emergency scheduled downtime if the slave database reports replication errors. (If the slave node is reporting replication errors, it will NOT be able to take over seamlessly from the master node during a failover event. Normal MOVEit DMZ operation is, however, not affected by replication errors.)

  1. From the Advanced Resiliency tab in the MOVEit DMZ Config program, shut down all services EXCEPT MySQL on all resilient nodes. (Start with the SLAVE node, then shut down services on the MASTER node, then shut down services on any other resilient nodes.)
  2. On the MASTER, press the "Record Replication" button. Wait for a "complete" or "OK" message.
  3. On the slave press the "Copy Database" button. Wait for a "complete" or "OK" message. (This procedure may take several minutes; open the "debug" window using the "Show Debug" button if you would like to see a running progress report.)
  4. On the slave, press the "Use Replication Info" button.
  5. Start resiliency services (Web Resil and DB Resil) on all resilient nodes. (Start with the MASTER node, then the SLAVE node, then any other resilient nodes.)

Troubleshooting

If the Copy Database step fails, make sure all network interface devices used by the resiliency cluster to talk to each other have Microsoft File and Printer Sharing enabled.